Commit Graph

5 Commits

Author SHA1 Message Date
Aere Network
51c17f08de AIP-20: clarification dated 2026-10-05 under the quantum threat model: the post-quantum seal is already required beside the classical signature on consensus messages; what is not active is the seal as the validity criterion (AIP-22 stage 4)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 17:11:14 +03:00
Aere Network
4739d4206b AIP-20: key reuse with the empty ML-DSA context, and a dated correction on consensus enforcement; AIP-22 and README: seals stated as many as the quorum, proving signing, not decision (erratum of 2026-10-01) 2026-10-01 19:11:23 +03:00
Aere Network
856c5df2f8 AIPs: dated notes for AIP-20, AIP-21 and AIP-22 on chain 2800; AIP-22 stages 1 to 3 active
AIP-22 described chain 2800 "today" as the chain before stages 1 to 3. A note dated 2026-09-30 says which
stages are active from which block; the index row and the README summary carry the same heights.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 13:27:18 +03:00
Aere Network
57fef08cd2 AIP-20: live on chain 2800 since block 19,900,000; the first native post-quantum transaction (block 19,900,028) imported identically by every node, the corrupted-signature control refused by both clients 2026-09-24 02:05:16 +03:00
Aere Network
c94b3f5c06 AIPs: AIP-20 and AIP-21 status rows carry the chain-2800 deployment of 2026-09-22 (AIP-21 live on all ten validators, AIP-20 armed for block 19,900,000); AIP-22 (post-quantum-only finality) added as a design-only Draft; the index no longer describes the pre-September world (seven validators, one client, no AIP above 19) and states which post-quantum layers are live with their heights 2026-09-23 01:30:13 +03:00