AIP-22 stage R and stage 4 in force on chain 2800 (2026-10-24, 2026-10-25): dated corrections to the README, pq-stark README and AIP index (votes attributed only through verified post-quantum seals since block 24,300,000; headers still admitted on ECDSA commit seals until stage 5), AIP-1 and CONTRIBUTING editorial rules corrected with their date, AIP-22 dated correction to rule 2 of section 4, AIP-3 interval dated

This commit is contained in:
Aere Network committed 2026-10-26 06:27:26 +02:00
1 parent 4c4d57cd2c
commit 0bf80e42fe
6 files changed
+31 -15

No files matched your search

+1 -1
View File
@@ -91,7 +91,7 @@ from an SP1 6.1.0 proof chain. Next free precompile address after Falcon-HashToP
the real path), so the top level still returns EMPTY for every real SP1 proof. See sections (a), (b),
(c), (d), (e), (f), and 8 below and `../../docs/AERE-STARK-VERIFIER-PORT-SPEC.md`.
- Mainnet chain 2800 has exactly the FIVE PQC precompiles 0x0AE1..0x0AE5. 0x0AE8 is not on any Aere
network. Consensus stays classical secp256k1 ECDSA QBFT - this is an EVM-layer precompile only.
network. Consensus is a separate layer - this is an EVM-layer precompile only.
## Layout